FT-02A · Plan + Section A-A
Color-coded canonical reinforcement · Section topology follows V5.3 approved source
REINFORCEMENT PLAN · F1
R1-X BasketR1-Y BasketR2-X LowerR2-Y LowerD1 StarterS1 Closed tiesPH1 Connection
SECTION A-A · APPROVED TOPOLOGY + PRODUCTION MARKS
R1 Inverted basketR2 Lower seatD1 StarterS1 Cap tiesPH1 type-specificColumn ties = grey
Interactive 3D · Canonical Reinforcement Model
Drag rotate · wheel/pinch zoom · layer toggles · same R1/R2/S1/D1 inputs as drawings and schedule
DRAG ROTATE · WHEEL/PINCH ZOOM
Rebar / Connection Schedule
DB main bars, S1 ties and pile-head connection are separated by role
| Mark | Element | Specification | Layout / behavior | Design status |
|---|
Calculation / Engineering Gates
Only checks supported by current inputs are activated; missing design checks remain explicit.
Service pile reaction—
Allowable Qa—
Service D/C—
Geometry—
Report / Export
Production detailing report · engineering status remains explicit
FT-02A Current Model
Required Actions Before Structural PASS
- Resolve PH1 pile-head connection from actual pile type and pile design/manufacturer detail.
- Verify PH1 embedment/development, local bearing and confinement.
- Verify S1 confinement requirement and spacing; default RB6 @150 is a reference preset only.
- Verify cap action: local shear/flexure or strut-and-tie where geometry requires.
- Engineer review of geotechnical Qa and project load combinations.